National Aluminium Company Ltd, Orissa
  • Detailed project report for installation of semi-fabrication facilities at Angul, Orissa
  • Aluminium alloy wheel plant at Bhubaneswar, (capacity: 4,50,000 wheels/year) and wheel alloy ingot line (capacity: 10,000 tons/year)
  • Detailed feasibility report for aluminium alloy sacrificial anode project, (capacity : 3,000 tons/ year).
  • Detailed feasibility report for continuous strip casting plant (capacity: 39,000 tpy) at Angul, Orissa
  • Detailed feasibility report for aluminium alloy cast wheel project (capacity: 400,000 wheels/ year), Angul, Orissa
  • Detailed feasibility report for aluminium beverage can project (capacity : 1.5 billion cans/year).
  • Detailed feasibility report for aluminium beverage can project
  • Techno economic feasibility report on aluminium smelter & captive power plant in Indonesia
Indian Aluminium Company Ltd, Kolkata
  • Plant location study and examination of all factors pertaining to site selection and recommendation of a few areas for aluminium smelter project (capacity: 30,000 tons/year of aluminium metal with provision for expansion to 100,000 tons in two stages)
National Metallurgical Laboratory, Jamshedpur
  • Layout, site survey, design and engineering, drawings and specifications, design supervision and plant commissioning services for magnesium metal project, Jamshedpur (capacity: 250 tons/year with provision for expansion to 500 tons/year)
Union Carbide India Ltd, Kolkata
  • Design and engineering of all civil, structural, architectural, utility and electrical works including supervision of construction at site for electrolytic manganese dioxide project, Mumbai (capacity: 400 tons/year capacity)
Bharat Aluminium Company Ltd.,New Delhi
  • Feasibility report for revamping/ modernisation of Bidhanbag Unit (capacity: 7,500 tpy), West Bengal
  • Techno economic feasibility report for downstream semi-fabrication facilities (capacity : 37,000 tons/year).
  • Demand study for aluminium metal, alloys and fabricated products in India including possibilities of substitution of scarce non-ferrous metals by aluminium; assessment of export trends and prospects; and estimation of shortfalls for determining product-mix for aluminium metal plant (capacity: 150,000 tons/year)
The Directorate of Industry, Government of Orissa, Orissa
  • Master plan and project profiles for alumina-based chemical industries, Damanjodi, Orissa, based on alumina available from NALCO
Cominco Binani Zinc Ltd, Kerala
  • Detailed engineering services for installation of zinc cathode melting and casting facilities at the Alwaye plant, Kerala.
Hindustan Copper Ltd, Rajasthan
  • Techno commercial re-evaluation of report for air pollution control scheme for Ghatsila and Khetri copper smelters
Southern Aluminium Company Ltd. (Balaji),Chennai
  • Feasibility report for aluminium semi-fabrication facilities
Jindal Iron and Steel Co Ltd
  • Techno economic feasibility report for tinning line complex (capacity: 100,000 tons/year) in Maharashtra.
Triton Corporation Ltd
  • Techno economic feasibility report and detailed engineering services for the tin smelter project at Haldia, West Bengal
Alcobex Metals Ltd
  • Techno economic viability study for non-ferrous metal plant at Jodhpur, Rajasthan
Indian Metals & Ferro Alloys Ltd, Bhubaneswar
  • Feasibility report on setting up an integrated aluminium complex in Orissa