Sinter and Pellet Plants

VSP-NMDC Joint Venture
  • Detailed feasibility report on iron ore pelletising plant
Rashtriya Ispat Nigam Ltd / Visakhapatnam Steel Plant
  • Detailed feasibility report on productivity enhancement of sinter plant 1 & 2 incorporating modern facilities (Capacity: 400 sq m grate area)
  • Assistance in operation and maintenance of the sinter plant and allied services.
NMDC Ltd
  • Techno economic feasibility report for installation of 2 million ton pelletising plant based on fines of Bailadila iron deposit; evaluation of alternative sites; specifying process and equipment for crushing, screening, grinding, pelletising, materials handling etc; development of plant layout, estimates of capital and operating costs and economic viability of the project.
  • Techno economic feasibility report on installation of pelletisation plant with slime beneficiation facilities at Bacheli, Chattisgarh
  • Techno economic feasibility report for installation of pelletisation plant with slime beneficiation facilities at Donimalai, Karnataka
Ministry of Steel and Mines, Government of India, New Delhi
  • Feasibility study for pelletisation project in Goa
Tata Steel Ltd
  • Complete design and engineering of raw material bedding & blending system for sinter plants for modernisation phase-I.
  • Design and engineering services for modernisation sinter plant and raw materials processing system
  • Feasibility report on iron ore pelletising plant
  • Total consultancy services for 6.8 MTPA growth plan including project report, detailed engineering, procurement, inspection, project management, progress monitoring, cost control & budgeting, construction planning, detailed site supervision and commissioning assistance for ‘H’ blast furnace and sinter plant-4
  • Techno economic feasibility report for ferrochrome plant in Richards Bay, South Africa & pellet plant in Orissa
  • Engineering services for installation of ESP for sinter plant-1 at Jamshedpur works
  • Installation of belt weigh feeder for coke & flux circuit at sinter plant-1 at Jamshedpur
  • Total engineering of new raw material bedding and blending system for supply of sinter feed materials to sinter plant no. 3 (1 MT expansion project)
  • Total consultancy services as part of 1 MTPA expansion including project report, detailed engineering, procurement, inspection, project management, progress monitoring, cost control & budgeting, construction planning, detailed site supervision and commissioning assistance at sinter plant (SP-3)
Tamil Nadu Industrial Development Corporation, Tamil Nadu
  • Techno economic feasibility report for mining, beneficiation and pelletisation of iron ore at Kanjamali and Thiruvannamalai Deposits
Bellary Steel and Alloys Ltd., Karnataka
  • Basic and detailed engineering; procurement services; project monitoring/management; construction supervision, inspection and quality assurance etc for integrated steel projects, Bellary (capacity : 0.5 million tons/year of bars and rods). The plant is based on the BF-BOF-CC route. Major facilities includes sinter plant (130 sw m); blast furnace (650 cu m); 2x50 ton BOF units; a 4-strand CC billet caster; and a bar and rod mill
Ispat Metallics India Ltd
  • Feasibility report on sinter plant
Jayaswals Neco Ltd, Raipur, Chattisgarh
  • Detailed engineering services for water system of sinter plant and steel melt shop
  • Engineering and other associated services for sinter plant project at Siltara, Raipur, Chattisgarh
Ispat Industries Ltd, Maharashtra
  • Basic and detailed engineering & consultancy services for sinter plant project at Dolvi (capacity: 198 sqm sinter plant)
  • Detailed engineering services for sinter plant raw material feeding system
  • Belt conveyors including waste material recycling facilities for new sinter plant having capacity of 2.0 MT per year at Dolvi
  • Detailed engineering services for waste material recycling system for sinter plant base mix at Dolvi works
  • Techno economic feasibility report for installation of 4.5 MTPA iron ore pelletisation plant at Visakhapatnam
  • Engineering services for conveyor system for the 198 Sq. M sinter plant
Janki Corporation Ltd, Karnataka
  • Techno economic feasibility report for installation of iron ore beneficiation & 0.6 MTPY pellet plant and 10 MW captive power plant at Bellary
  • Techno economic feasibility report for 0.6 MTPY pellet plant and 15 MW captive power plant at Sidiginamola village near Bellary, Karnataka
Tungabhadra Minerals Pvt Ltd
  • Techno economic feasibility report for 1.2 MTPA iron ore pellet plant in Karnataka
PrintPrint Add To Favorites